Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kato, Yuki; Yoshida, Hiroyuki; Yokoyama, Ryotaro*; Kanagawa, Tetsuya*; Kaneko, Akiko*; Monji, Hideaki*; Abe, Yutaka*
Proceedings of 23rd International Conference on Nuclear Engineering (ICONE-23) (DVD-ROM), 8 Pages, 2015/05
Yoshida, Hiroyuki; Nagatake, Taku; Takase, Kazuyuki; Kaneko, Akiko*; Monji, Hideaki*; Abe, Yutaka*
Mechanical Engineering Journal (Internet), 1(4), p.TEP0025_1 - TEP0025_11, 2014/08
Takeuchi, Suehiro; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Yoshida, Tadashi
Nuclear Instruments and Methods in Physics Research A, 513(3), p.429 - 438, 2003/11
Times Cited Count:3 Percentile:27.66(Instruments & Instrumentation)At the JAERI Tandem accelerator, an acceleration tube replacing plan is proceeding to increase the acceleration voltage toward 20 MV. Lengthy conditioning is generally necessary for a large tube system. We had an idea to clean the tubes with high-pressure water-jet rinsing before installation. We cleaned tubes and tested them at 1 MV and 3 MV. The both results exhibited that the voltages went beyond the rated voltages and discharge activities were much less than the old records. During the test of new tubes at 3 MV, the conditioning proceeded well and an extremely stable condition was fulfilled within 24 hours. In conclusion, the cleaning was found to be a very promising way to improve high-voltage performance of the tubes in a large tube system.
Takeuchi, Suehiro; Nakanoya, Takamitsu; Kabumoto, Hiroshi; Ishizaki, Nobuhiro; Matsuda, Makoto; Tsukihashi, Yoshihiro; Kanda, Susumu; Tayama, Hidekazu; Abe, Shinichi; Yoshida, Tadashi
Dai-14-Kai Kasokuki Kagaku Kenkyu Happyokai Hokokushu, p.308 - 310, 2003/00
no abstracts in English
Yamamoto, Masanobu; Tamura, Fumihiko; Ezura, Eiji*; Hashimoto, Yoshinori*; Mori, Yoshiharu*; Omori, Chihiro*; Schnase, A.*; Takagi, Akira*; Uesugi, Tomonori*; Yoshii, Masahito*
Proceedings of 8th European Particle Accelerator Conference (EPAC 2002), p.1073 - 1075, 2002/00
Longitudinal beam emittance should be controlled to alleviate space charge effects by rf manipulations at 3 GeV proton synchrotrons in JAERI-KEK Joint High Intensity Proton Accelerator Project. At injection, bunching factor of 0.4 will be achived by controlled longitudinal beam painting and multiplying 2nd higher harmonics. Furthermore, heavy beam loading is a severe problem, and it should be compensated by feedforward method for stable acceleration. About these themes, the scenario will be described with particle tracking simulations.
Tsuneoka, Masaki; Imai, Tsuyoshi; E.Bowles*; I.Benfatto*; *; *
Fusion Engineering and Design, 45(2), p.197 - 207, 1999/00
Times Cited Count:1 Percentile:13.12(Nuclear Science & Technology)no abstracts in English
Tsuneoka, Masaki; Fujita, Hideo*; Sakamoto, Keishi; Kasugai, Atsushi; Imai, Tsuyoshi; Nagashima, Takashi; *; *; *; *; et al.
Fusion Engineering and Design, 36(4), p.461 - 469, 1997/00
Times Cited Count:23 Percentile:84.17(Nuclear Science & Technology)no abstracts in English